Early November 05 Construction

1 2 3 4 5 6 7 8 9 10-22



By the time construction of the resort is complete, the sand around Building D will be filled in, such that the first floor verandas will be one step above ground level. The filling in of this area will assist in drainage for the building as well as for the property as a whole.