Here
is foundation of Building A. After pylons are driven down
to bedrock, large concrete walls are erected in a grid
over the pylons. Then, the area in between these walls
is filled in as pictured here. Next, rebar is laid across
the foundation. After that a concrete slab is poured,
completing the foundation. |