Early November 05 Construction

10 11 12 13 14 15 16 17 18



This is the living room of second floor condo D3. The aluminum door frames can be seen here. Over the next two weeks our crew will complete the drop ceilings in this condo and and install the windows and doors.

Previous

Back to Construction Gallery

Back to Main Photo Gallery