Buildings B & C Construction

1 2 3 4 5 6 7 8 9 10 11



Here is a closer look at the footprint of Building B. The water that can be seen is the line of the water table, roughly three feet below current ground level. Next, pylons will be driven down to the bedrock roughly 10 feet below, and then the footing will be constructed.