Early May 06
Building A Construction

1-9 10 11 12 13 14 15 16-29



Here is a close-up of first floor condo A2. Ground level will eventually be raised to one step below the veranda height. The master bedroom can be seen at left, the master bedroom at center, and the living room is behind the cement blocks to the right.

Previous

Back to Construction Gallery

Back to Main Photo Gallery