Early May 06
Building A Construction

1-9 10 11 12 13 14 15 16-29



Here is the underside of the second floor veranda of Building A. The tapered cantilevered beams pictured here provide the support for expansive private verandas. A drop ceiling will eventually be installed at the base of the beams.

Previous

Back to Construction Gallery

Back to Main Photo Gallery