September Construction Progress - Building B
1 2 3
|

Two large cisterns have been
built into the foundation of Building B.
|

The slab is insulated with Styrofoam to protect both
the water supply and the slab from water damage.
|
The foundation prior to the concrete pour.
|

Steel work being done prior to the concrete pour.
|

The foundation's slab was poured over three days.
First, the stair and veranda slab's were poured,
then came B2's floor, and then B1's floor.
|

Here is B1's floor being leveled off.
|