Late May Construction

1-9 10 11 12 13 14

Here is the beginnings of the floor of D5. The five-inch layer of styrofoam and T-beams is featured. Atop this layer will be laid a large amount of rebar, which will then be encased in a large pour of concrete to complete the slab.


Previous

Back to Construction Gallery

Back to Main Photo Gallery