Late May Construction

1 2 3 4 5 6 7 8
9 10-14


We have recently erected scaffolding around the south and east faces of Building D. We have also poured a portion of the third floor slab pictured above the main staircase.



Back to Construction Gallery

Back to Main Photo Gallery