Late June 06 Construction
1 2 3 4 5 6 7 8



Condo A2 can be seen here on the first floor while condo A6 is located directly above it on the second floor. The structural beams above condos A7 and A8 will be poured later this month, and the beams above A5 and A6 will be poured in early July.

Previous

Back to Construction Gallery

Back to Main Photo Gallery