Late April Construction
1 2 3 4 5 6 7 8 9 10-20



Here is the southeast corner of Building D. Residence D1 is in the center of this picture on the first floor, while D3 is the second floor residence whose walls are under construction.


Previous

Back to Construction Gallery

Back to Main Photo Gallery