June 06 Construction
1-15 16 17 18 19 20 21 22-24



Here can be seen the recent progress inside beach view condos A4 on the first floor and A8 on the second floor. Above the walls of A8 there is a large amount of steel that will be a part of the third floor slab.

Previous

Back to Construction Gallery

Back to Main Photo Gallery