June 06 Construction
1-15 16 17 18 19 20 21 22-24



Here can be seen the recent progress inside beach view condos A3 on the first floor and A7 on the second floor. Our crew has begun construction on the structural beams of the third floor slab above A7.

Previous

Back to Construction Gallery

Back to Main Photo Gallery