February 06 Construction

1 2 3 4 5 6 7 8 9 10-20



Here is the master bedroom of beachfront condo D3. Next steps include the installation of base molding, ceiling fans, cabinets, closets, interior doors, and window and door molding.

Previous

Back to Construction Gallery

Back to Main Photo Gallery