February 06 Construction

1-9 10-16 17 18 19 20



Here is the living room of beachfront condo D6, which is still available. The drop ceiling is being finished at the moment, and soon the walls will be painted, and then the floor will be tiled.

Previous

Back to Construction Gallery

Back to Main Photo Gallery