February 06 Construction

1-9 10 11 12 13 14 15 16 17-20



At the center of this picture is the entrance to the staircase that provides rooftop access for Building D. Part of the entrance way that leads to third floor condos D5 and D6 can also be seen here.

Previous

Back to Construction Gallery

Back to Main Photo Gallery