December 05 Construction

1 2 3 4 5 6 7 8 9 10-19



Here is the foundation of Building A, focusing on where condos A3 and A4 will be built. Ground level will eventually be filled in and graded in a manner to allow rainwater to run off the property in various directions.

Previous

Back to Construction Gallery

Back to Main Photo Gallery