December 05 Construction

1-9 10-16 17 18 19



Here is the living room of beachfront condo D3. The condo's recessed lights and drop ceilings were recently installed and the interior walls will soon be painted.

Previous

Back to Construction Gallery

Back to Main Photo Gallery