December 05 Construction

1-9 10 11 12 13 14 15 16 17-19



This is the living room of beachfront condo D1. The walls were recently painted and then the floors were tiled. Grout is being applied at the moment. Next steps include the installation of window and door molding, as well as the doors, cabinets, and closets.