2006 Construction Progress - Building C
1 2 3
|

The
recently poured verandas
of second floor condos C3 and C4.
|

The second floor slab of Building
C
was poured in mid August 2006.
|

After the pouring of the slab our crew immediately
began construction of the walls of C3 and C4.
|

The
main staircase of Building C viewed from the west.
|

The Maya-inspired staircase to Building C will greet
visitors in a grand manner befitting The Phoenix.
|

The main staircase was recently poured, making it
much easier to view Building C's second floor condos.
|