Early April 06 Construction
1 2 3 4 5 6 7 8 9 10-19



Here is the entrance way leading to third floor beachfront condos D5 and D6. This area is currently being tiled with a beautiful and non-slippery Mexican ceramic tile, the same tile that is being used on the exterior staircases of Building D.

Previous

Back to Construction Gallery

Back to Main Photo Gallery