Early April 06 Construction
1-9 10 11 12 13 14 15 16-19



Here is another part of D5's recently tiled veranda that faces the pool and grounds. A stainless steel cable hand rail system will soon be installed along the edges of our second and third floor verandas.

Previous

Back to Construction Gallery

Back to Main Photo Gallery