Construction Progress - October 2006
| Milestone |
Foundation |
Walls |
Roof |
Windows
& Doors |
Paint
& Tile |
Finish
Work |
Complete |
|
Completion Date |
X |
Jan
07 |
Mar
07 |
May
07 |
June
07 |
July
07 |
Sept
07 |
| %
Complete |
20% |
40% |
60% |
70% |
80% |
90% |
100% |
|

The floor plan of second floor condo B4 will mimic the
floor plan of first floor condo B2 pictured here.
|

B4 will be built directly above B2, which is pictured here.
|

Both condos offer a spacious veranda accessible
from the living room and master bedroom.
|

Both
condos offer a large living room and kitchen area.
The slab separating B2 and B4 will be poured by early December.
|

Following
the pouring of the second floor slab, the
walls of B4 will be started in mid December 2006.
|

B4 will offer a terrific view from its Caribbean-facing veranda.
|