Construction Progress - November 2006
| Milestone |
Foundation |
Walls |
Roof |
Windows
& Doors |
Paint
& Tile |
Finish
Work |
Complete |
|
Completion Date |
X |
X |
X |
March
07 |
April
07 |
May
07 |
June
07 |
| %
Complete |
20% |
40% |
60% |
70% |
80% |
90% |
100% |
|

The third floor slab of Building C was poured in mid November.
|

C1's veranda is a shaded retreat thanks
to C3's veranda located directly above.
|

C1 is the first floor condo pictured here.
|

C1's spacious living room and kitchen
area look out towards the Caribbean.
|

The
walls of the master bedroom have been rough plastered.
|

C1's master bedroom provides direct access to the condo's veranda.
|