A2 Construction Progress - December 2006


Milestone

Foundation

Walls

Roof

Windows & Doors

Paint & Tile

Finish Work

Complete

Completion Date

X

X

X

X

Jan 07

Mar 07

June 07

% Complete

20%

40%

60%

70%

80%

90%

100%




A2 is the first floor condo pictured at right. A2's close proximity to the beachfront leads to amazing views from inside and on its veranda.






A2's walls have been painted and 70% of its tile has been laid.







Looking out from the kitchen onto the living room of A2.






The tiling of A2's master bedroom will be completed in early January.







The spacious and open shower in A2's master bathroom.









The 550-foot veranda of A2 is accessible from each room.







A2, like all of our first floor condos in
Building A, is being built 7' above sea level.








While A2 is not technically a beachfront condo,
it still provides gorgeous Caribbean views like this.





A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12


B1

B2

B3

B4

B5

B6

C1

C2

C3

C4

C5

C6


Building A

Building B

Building C

Building D

Property

Rooftop Views



Back to Construction Progress Chart


Back to Construction Photo Gallery


Back to Main Photo Gallery