Construction Progress - December 2006
| Milestone |
Foundation |
Walls |
Roof |
Windows
& Doors |
Paint
& Tile |
Finish
Work |
Complete |
|
Completion Date |
X |
X |
X |
X |
Jan
07 |
Mar
07 |
June
07 |
| %
Complete |
20% |
40% |
60% |
70% |
80% |
90% |
100% |
|

A2 is the first floor condo pictured at right. A2's close proximity
to the beachfront leads to amazing views from inside and on its
veranda.
|

A2's walls have been painted and 70% of its tile has been laid.
|

Looking
out from the kitchen onto the living room of A2.
|

The tiling of A2's master bedroom will be completed in early January.
|

The spacious and open shower in A2's master bathroom.
|

The 550-foot veranda of A2 is accessible from each room.
|

A2,
like all of our first floor condos in
Building A, is being built 7' above sea level.
|

While A2 is not technically a beachfront condo,
it still provides gorgeous Caribbean views like this.
|