The Phoenix Restaurant & Lobby Building - Mid May 2008

The Phoenix Resort in Belize Restaurant and Lobby Building Construction #1


The first floor walls of the Restaurant
and Lobby Building were recently completed.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #2



This is where the lobby of The Phoenix is being built.


The Phoenix Resort in Belize Restaurant and Lobby Building Construction #3



The walls were put up in about 10 days.


The Phoenix Resort in Belize Restaurant and Lobby Building Construction #4


Here is the interior portion of
the restaurant of The Phoenix.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #5


These construction materials presently occupy the area where
there will be outdoor seating for the restaurant in a courtyard.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #6


The restaurant and lobby both have large
windows and doors that face the courtyard.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #7


A Maya-temple inspired staircase will lead Phoenix guests to an
outdoor roof deck bar, a health and fitness center, and a spa.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #8


Here is part of the west face of the Restaurant and Lobby
Building that will be stepped back and face Middle Street.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #9


The lobby seen here will be the main entrance to the resort.
Large planters will be built on either side of the main doors.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #10


Here is the restaurant of The Phoenix taking shape
looking towards the residential buildings of the resort.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #11


Our crew is presently constructing the beams that will sit on top of the concrete block walls and form a major part of the second floor slab.


The Phoenix Resort in Belize Restaurant and Lobby Building Construction #12


Later this month after the beams are poured we will begin
laying the T beams and bovadilla styrofoam panels across them.