The Phoenix Restaurant & Lobby Building - May 2008

The Phoenix Resort in Belize Restaurant and Lobby Building Construction #1


After the walls of the foundation were completed our
crew begin to fill the foundation in with compacted sand.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #2


A layer of water proofing plastic was then
placed over the grid of 10' by 10' sections of sand.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #3


A network of steel was then tied together to provide
reinforcement in the building's foundation slab.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #4


Here is the foundation of the Restaurant and Lobby
Building looking towards Residential Buildings A, B, & C.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #5


Here is the building's foundation in late April
viewed from Building B prior to the concrete pour.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #6


The Restaurant and Lobby
Building faces Middle St. to the west.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #7


A great deal of sand, gravel, and cement
was required for the 400+ bag concrete pour.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #8


Here are members of our crew in the
midst of pouring the foundation's slab.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #9


All of the plumbing and conduit for the electrical wiring
must be set up prior to the pour of the foundation's slab.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #10


Here is the foundation of the Restaurant and Lobby Building
immediately after its slab was poured in early May 2008.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #11


After being poured the slab was watered down over the following
24 hours to avoid any cracking in our warm weather environment.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #12


With the foundation slab completed our crew begin taking
measurements to begin laying the blocks of the first floor walls.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #13


The area featured here is where the first floor lobby will be
built. Above the lobby will b
e a large second floor roof deck.


The Phoenix Resort in Belize Restaurant and Lobby Building Construction #14


Seating for the restaurant of The Phoenix will be in the area
seen at left and in an open air patio to be built on the right
.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #15


This is where the kitchen for the restaurant will be on the
first floor. On the second floor will be an open air roof deck bar.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #16


Here are some of the many concrete blocks that will be used to build
the Restaurant and Lobby Building's first floor walls in May 2008.