The Phoenix Restaurant & Lobby Building - April 2008

The Phoenix Resort in Belize Restaurant and Lobby Building Construction #1


Here is the site of The Phoenix's Restaurant and
Lobby Building prior to the start of construction.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #2

In addition to housing our resort's restaurant and lobby,
this building will also feature a spa, health and fitness center,
business center, multiple bathrooms, and an upstairs outdoor bar.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #3


The first major step of construction
was to excavate the building site.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #4


Simultaneously our crew began tying the
steel used in the footing of the foundation.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #5


Here is the building's footing after being poured. The steel and concrete footing was built atop a 10' by 10' grid of pilings that sits on bedrock.


The Phoenix Resort in Belize Restaurant and Lobby Building Construction #6

The building is being built in the southwest corner of The Phoenix
property. The enclosed area on the second floor will be set back from
the first floor, creating a large outdoor deck on the second floor.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #7



Next our crew began construction of the walls of the foundation.


The Phoenix Resort in Belize Restaurant and Lobby Building Construction #8


The finished foundation height will
be six and a half feet above sea level.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #9


Here is the foundation after the
concrete block walls were completed.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #10


Here is the foundation of the Restaurant and Lobby Building
in the forefront and Buildings A, B, and C in the background.



The Phoenix Resort in Belize Restaurant and Lobby Building Construction #11


Where our construction materials are being kept will
eventually become an outdoor patio for the resort's restaurant.





Construction Progress Chart

Construction History Chart

Construction Photo Gallery

Main Photo Gallery