The Phoenix Pool & Property - Late February 2008

The Phoenix Resort in Belize Pool Construction #1


Here are the pools and property of
The Phoenix in late February 2008.



The Phoenix Resort in Belize Pool Construction #2


Here is a perspective of the
pools looking out from Building B.





The Phoenix Resort in Belize Pool Construction #3




About 70% of the main pool has been tiled.




The Phoenix Resort in Belize Pool Construction #4



The remainder of the main pool
will be tiled over the next seven days.


The Phoenix Resort in Belize Pool Construction #5



Here is the main pool of The Phoenix viewed from Building C.


The Phoenix Resort in Belize Pool Construction #6


This is another perspective of the main
pool and Caribbean beyond from Building C.




The Phoenix Resort in Belize Pool Construction #7

There will be a large infinity edge waterfall bringing water from
the upper level of the pool to the lower level. There is also a bench
being built next to this waterfall that will provide another place to relax.




The Phoenix Resort in Belize Pool Construction #8


Here is the U-shaped sitting area along the south edge of the
lower pool that will provide a shaded area for relaxing poolside.



The Phoenix Resort in Belize Pool Construction #9


The lap pool of The Phoenix features built in seating that will make the
pool another place for people to relax when it's not in use for exercise.



The Phoenix Resort in Belize Pool Construction #10



Here is the poolside bar being built between the pools.


The Phoenix Resort in Belize Pool Construction #11


This another perspective of the bar. This area will serve drinks, provide towels, and be able to place food orders with the onsite restaurant.


The Phoenix Resort in Belize Pool Construction #12


The two pools of The Phoenix are
scheduled to be completed by mid March 2008.



The Phoenix Resort in Belize Pool Construction #13


This is the one of the many spacious sun decks
being built adjacent to the main pool of The Phoenix.



The Phoenix Resort in Belize Pool Construction #14


This picture captures the finished detail of the pool deck. River stones
have been set in yellow-dyed cement in lines around the 4' by 4' pavers.



The Phoenix Resort in Belize Pool Construction #15


This is the seawall of The Phoenix in the process of being rebuilt. Its width & height have been increased and it has been re-enforced in many places.


The Phoenix Resort in Belize Pool Construction #16


Our crew will next begin finishing the sea
wall in the same manner as our pool deck
.


The Phoenix Resort in Belize Pool Construction #17

Pictured here is the southernmost 25% of the sea wall that is also
being rebuilt. This perspective captures how much higher and wider
we are making the new sea wall, which will much better protect the
property in the event of storm surges and be more pleasant to walk on.



The Phoenix Resort in Belize Pool Construction #18



This is the wall that will provide security and privacy along
the western border of the property. It was recently painted.



The Phoenix Resort in Belize Pool Construction #19


On the inside of this wall behind Building B
many trees and other greenery will be grown.



The Phoenix Resort in Belize Pool Construction #20


This picture captures some of the local
wildlife on the property of The Phoenix.





Construction Progress Chart

Construction History Chart

Construction Photo Gallery

Main Photo Gallery