C6 Construction Progress - April 2008


Milestone

Paint & Tile

Kitchen &
BTH Cabinets

Appliances
& Fixtures

Wood
Finish Work

Furniture

Complete

Completion Date

X

X

X

Apr 08

Apr 08

Apr 08

% Complete

75%

80%

85%

90%

95%

100%



The Phoenix Resort in Belize Condo C6 #1


Here is the living room and
kitchen of condo C6 in early April 2008
.



The Phoenix Resort in Belize Condo C6 #2


Over the last couple of weeks all of the
appliances and fixtures in C6 were installed.






The Phoenix Resort in Belize Condo C6 #3



The granite and fixtures in C6's guest
bathroom were recently installed.





The Phoenix Resort in Belize Condo C6 #4



Here is the stackable washer and dryer found in a
closet in C6's guest bathroom that was recently connected.





The Phoenix Resort in Belize Condo C6 #5



Some of the mattresses that will be used on C6's
beds are presently stacked in the condo's guest bedroom.






The Phoenix Resort in Belize Condo C6 #6



The marble countertops in C6's
master bathroom are now complete.






The Phoenix Resort in Belize Condo C6 #7



The marble surrounding C6's
Jacuzzi tub was also recently finished.






The Phoenix Resort in Belize Condo C6 #8



Here are the recently installed
stainless steel handrails of condo C6.






The Phoenix Resort in Belize Condo C6 #9



Here is a view of the main pool
of The Phoenix from C6's veranda.





The Phoenix Resort in Belize Condo C6 #10



Here is a view of the finished veranda of condo
D5 and Caribbean beyond as seen from condo C6.



A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12


B1

B2

B3

B4

B5

B6

C1

C2

C3

C4

C5

C6




Construction Progress Chart

Construction History Chart

Construction Photo Gallery

Main Photo Gallery