C5 Construction Progress - April 2008


Milestone

Paint & Tile

Kitchen &
BTH Cabinets

Appliances
& Fixtures

Wood
Finish Work

Furniture

Complete

Completion Date

X

X

X

Apr 08

Apr 08

Apr 08

% Complete

75%

80%

85%

90%

95%

100%



The Phoenix Resort in Belize Condo C5 #1


Here is the living room and
kitchen of condo C5 in early April 2008
.



The Phoenix Resort in Belize Condo C5 #2


Over the last couple of weeks all of the
appliances and fixtures in C5 were installed.






The Phoenix Resort in Belize Condo C5 #3




These are the pendant lights that hang above C5's breakfast bar.




The Phoenix Resort in Belize Condo C5 #4




C5's
master bathroom's countertops were recently installed.





The Phoenix Resort in Belize Condo C5 #5



The marble surrounding the Jacuzzi
tub of condo C5 was also recently installed.






The Phoenix Resort in Belize Condo C5 #6



The marble countertops in C5's
guest bathroom are now complete.






The Phoenix Resort in Belize Condo C5 #7



Here is the stackable washer and dryer found in a
closet in C5's guest bathroom that was recently connected.






The Phoenix Resort in Belize Condo C5 #8



Some of the mattresses that will be used on C5's
beds are presently stacked in the condo's guest bedroom.






The Phoenix Resort in Belize Condo C5 #9



This is the view from C5's master bedroom
looking out onto the pool and grounds of The Phoenix.






The Phoenix Resort in Belize Condo C5 #10



Here is the Caribbean view from C5's veranda
overlooking the main pool of The Phoenix.




A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12


B1

B2

B3

B4

B5

B6

C1

C2

C3

C4

C5

C6




Construction Progress Chart

Construction History Chart

Construction Photo Gallery

Main Photo Gallery