Construction Progress - June 2008
| Milestone |
Paint & Tile |
Kitchen
&
BTH Cabinets |
Appliances
& Fixtures |
Wood
Finish Work |
Furniture |
Complete |
|
Completion Date |
X |
X |
X
|
June
08 |
June
08 |
July
08 |
| %
Complete |
75% |
80% |
85% |
90% |
95% |
100% |
|

Here
is the beautiful view of the main pool of The
Phoenix and the Caribbean beyond from condo C3's veranda.
|

With
the granite countertops now finished in C3's kitchen the GE
stainless steel appliances and Kohler fixtures were recently installed.
|

This
is the recently installed marble
countertop in C3's master bathroom.
|

Here
is the recently installed marble
countertop in C3's guest bathroom.
|

With
the marble countertop around the Jacuzzi now set our crew will
soon install the Jacuzzi tub and mirror that rests on the Jacuzzi
shelf.
|

The
closets and interior doors in C3
will be installed later this month.
|

This
is the beautiful Caribbean view from C3's master bedroom.
|

Residential
Building C can be seen at left. Condo C3 is the
second floor condo on the left hand side of the building.
|