C2 Construction Progress - March 2007


Milestone

Foundation

Walls

Roof

Windows & Doors

Paint & Tile

Finish Work

Complete

Completion Date

X

X

X

X

     

% Complete

20%

40%

60%

70%

80%

90%

100%




C2 will offer beautiful Caribbean views from its living room
seen here on the right and its master bedroom on the left.







Being set back from the beachfront provides C2 a great deal of privacy.








The drop ceiling above the veranda is nearly complete.








The drop ceiling was constructed using pine, plycem, and a mesh netting
which will cause the rough plaster to adhere better
when it is applied.







Next, our crew will begin building
the treated pine drop ceiling inside C2.







After that, the electrical, plumbing, and air conditioning
equipment will be installed inside the condo's drop ceiling.




A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12


B1

B2

B3

B4

B5

B6

C1

C2

C3

C4

C5

C6


D1

D2

D3

D4

D5

D6



Back to Construction Progress Chart


Back to Construction Photo Gallery


Back to Main Photo Gallery