C2
Construction Progress - March 2007
| Milestone |
Foundation |
Walls |
Roof |
Windows
& Doors |
Paint
& Tile |
Finish
Work |
Complete |
|
Completion Date |
X |
X |
X |
X |
|
|
|
| %
Complete |
20% |
40% |
60% |
70% |
80% |
90% |
100% |
|

C2 will offer beautiful Caribbean views from its living room
seen here on the right and its master bedroom on the left.
|

Being set back from the beachfront provides C2 a great deal of
privacy.
|

The drop ceiling above the veranda is nearly complete.
|

The drop ceiling was constructed using pine, plycem, and a mesh
netting
which will cause the rough plaster to adhere better when
it is applied.
|

Next,
our crew will begin building
the treated pine drop ceiling inside C2.
|

After
that, the electrical, plumbing, and air conditioning
equipment will be installed inside the condo's drop ceiling.
|