C2 Construction Progress - February 2008


Milestone

Paint & Tile

Kitchen &
BTH Cabinets

Appliances
& Fixtures

Wood
Finish Work

Furniture

Complete

Completion Date

X

X

Apr 08

Apr 08

Apr 08

Apr 08

% Complete

75%

80%

85%

90%

95%

100%


The Phoenix Resort in Belize Condo C2 #1


Here is residential Building C in early February 2008. Condo
C2 is the first floor two bedroom condo seen here on the right.


The Phoenix Resort in Belize Condo C2 #2



The kitchen cabinets in condo C2 are nearly complete.




The Phoenix Resort in Belize Condo C2 #3



The master bathroom cabinets are also finished. Above is a shelf
that will provide additional surface area below the bathroom's mirror.





The Phoenix Resort in Belize Condo C2 #4




The guest bathroom cabinets are also complete in condo C2.





The Phoenix Resort in Belize Condo C2 #5



Many fixtures such as the Hunter ceiling
fans and recessed lights have been installed.






The Phoenix Resort in Belize Condo C2 #6



The light fixtures above the area where mirrors will be
installed in the master and guest bathrooms have been added.






The Phoenix Resort in Belize Condo C2 #7



This is the Caribbean view overlooking
the main pool of The Phoenix from condo C2
.





The Phoenix Resort in Belize Condo C2 #8



Here is a perspective on the construction of the
main pool from condo C2 in early February 2008.




A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12


B1

B2

B3

B4

B5

B6

C1

C2

C3

C4

C5

C6


The Phoenix Pools & Property




Construction Progress Chart

Construction History Chart

Construction Photo Gallery

Main Photo Gallery