C1 Construction Progress - February 2008


Milestone

Paint & Tile

Kitchen &
BTH Cabinets

Appliances
& Fixtures

Wood
Finish Work

Furniture

Complete

Completion Date

X

Mar 08

Apr 08

Apr 08

Apr 08

Apr 08

% Complete

75%

80%

85%

90%

95%

100%


The Phoenix Resort in Belize Condo C1 #1


Here is residential Building C in early February 2008. Condo
C1 is the first floor two bedroom condo seen here on the left.


The Phoenix Resort in Belize Condo C1 #2



Woodworks installation in condo C1 has recently began.




The Phoenix Resort in Belize Condo C1 #3



Here are the cabinets of the master
bathroom in the process of being installed.





The Phoenix Resort in Belize Condo C1 #4



The frame of the cabinets in the guest bathroom are
also now onsite and will soon be installed in condo C1.






The Phoenix Resort in Belize Condo C1 #5



Many fixtures such as the Hunter ceiling
fans and recessed lights have been installed.






The Phoenix Resort in Belize Condo C1 #6



The light fixtures above the area where mirrors will be
installed in the master and guest bathrooms have been added.






The Phoenix Resort in Belize Condo C1 #7



This is the Caribbean view over-
looking the main pool of The Phoenix
.





The Phoenix Resort in Belize Condo C1 #8



Here is a perspective on the construction of the
main pool from condo C1 in early February 2008.




A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12


B1

B2

B3

B4

B5

B6

C1

C2

C3

C4

C5

C6


The Phoenix Pools & Property




Construction Progress Chart

Construction History Chart

Construction Photo Gallery

Main Photo Gallery