C1
Construction Progress - December 2007
| Milestone |
Windows
& Doors |
Paint |
Tile |
Finish
Work |
Appliances
& Fixtures |
Furniture |
Complete |
|
Completion Date |
X |
X |
X |
Feb
08 |
Feb
08 |
Mar
08 |
Mar
08 |
| %
Complete |
70% |
75% |
80% |
85% |
90% |
95% |
100% |
|

Here
is residential Building C in late December 2007.
Condo
C1 is the first floor two bedroom condo seen here on the left.
|

C1's
veranda provides areas in the
sun and shade for most of the day.
|

This
is the view of the main pool of
The Phoenix from condo C1 in late December 2007.
|

Building
C's first floor condos are over 6' above sea level,
which helps to create Caribbean views like this from condo C1.
|

Installation
of the cabinetry in C1's
kitchen will begin in January 2008.
|

Here is the large closet found in C1's master bedroom.
|

This
is the frame where the Jacuzzi will be installed
beside the spacious shower of C1's master bathroom.
|

The
two windows in C1's master
bathroom bring in a lot of natural light.
|