B6
Construction Progress - December 2007
| Milestone |
Windows
& Doors |
Paint |
Tile |
Finish
Work |
Appliances
& Fixtures |
Furniture |
Complete |
|
Completion Date |
X |
Jan
08 |
Jan
08 |
Apr
08 |
Apr
08 |
May
08 |
May
08 |
| %
Complete |
70% |
75% |
80% |
85% |
90% |
95% |
100% |
|

B6 is the third floor three bedroom condo seen here at right.
|

The
private veranda of B6 extends
11' towards the pools and Caribbean.
|

The
wooden pergolas above B6's living
room windows were recently installed.
|

This
is the gorgeous Caribbean view from third floor condo B6.
|

This
is a view of the main pool of The Phoenix from condo B6.
|

The
drop ceiling in the living room and kitchen of B6 is now
complete. In January 2008 the condo will be painted and tiled.
|

Here
is one of the two guest bedrooms in condo B6.
It will also be painted and tiled in January 2008.
|

B6's
second guest bedroom offers a 4' by 4'
window that brings a lot of natural light into the room.
|

Here
is the spacious guest bathroom in condo B6.
It is the largest guest bathroom at The Phoenix.
|

The
air conditioning equipment was
recently delivered and installed in condo B6.
|