B3
Construction Progress - June 2008
| Milestone |
Paint & Tile |
Kitchen
&
BTH Cabinets |
Appliances
& Fixtures |
Wood
Finish Work |
Furniture |
Complete |
|
Completion Date |
X |
July
08 |
July
08 |
July
08 |
July
08 |
July
08 |
| %
Complete |
75% |
80% |
85% |
90% |
95% |
100% |
|

Here
is the kitchen of second floor one
BR condo B3 in the process of being installed.
|

After
the kitchen cabinets are completed the GE stainless
appliances will be unpacked from their boxes and installed.
|

Condo
B3 offers a large master bedroom and a
closet with a separate lockable owner's storage above.
|

Condo
B3 offers a gorgeous view of the lap pool
of The Phoenix as well as the rest of the property.
|

This
is the Caribbean perspective from condo B3's veranda.
|

This
is a view of residential Building B in early June 2008.
Condo B3 is the second floor condo seen on the left.
|