A9 Construction Progress - September 2007


Milestone

Windows
& Doors

Paint

Tile

Finish Work

Appliances
& Fixtures

Furniture

Complete

Completion Date

X

X

X

Nov 07

Nov 07

Nov 07

Dec 07

% Complete

70%

75%

80%

85%

90%

95%

100%

The Phoenix Resort in Belize Condo A9 #1


Our crew stored the pergolas in A9's living room
prior to beginning their installation in early October.



The Phoenix Resort in Belize Condo A9 #2


Here are additional pergola beams ready to be
installed above A9's master bedroom windows and doors.






The Phoenix Resort in Belize Condo A9 #3



The scaffolding on the veranda is set up
to assist in the installation of the pergolas.





The Phoenix Resort in Belize Condo A9 #4



The verandas of A5 (2nd floor) and A9 (3rd floor) will have stainless steel cable handrails matching the systems recently installed on D3 & D5.





The Phoenix Resort in Belize Condo A8 #5



The woodworks inside A9 will be installed over the next two months.






The Phoenix Resort in Belize Condo A9 #6



Here is the back hallway behind A9. Stainless steel handrails will
also line this walkway leading to the building's four third floor condos.




A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12


B1

B2

B3

B4

B5

B6

C1

C2

C3

C4

C5

C6


The Phoenix Property 1




Construction Progress Chart

Construction History Chart

Construction Photo Gallery

Main Photo Gallery