A7
Construction Progress - October 2007
| Milestone |
Windows
& Doors |
Paint |
Tile |
Finish
Work |
Appliances
& Fixtures |
Furniture |
Complete |
|
Completion Date |
X |
X |
X |
Nov
07 |
Nov
07 |
Nov
07 |
Nov
07 |
| %
Complete |
70% |
75% |
80% |
85% |
90% |
95% |
100% |
|

Here
is a view of second floor
condo A7's spacious private veranda.
|

The
woodworks inside A7 are presently being installed.
|

Here is the GE slide in range that recently arrived onsite.
|

This
is the GE stainless steel refrigerator
that will soon be installed in A7's kitchen.
|

This is A7's large capacity GE stackable laundry center.
|

The
toilet, shower fixtures, and cabinetry
in the guest bathroom of A7 have all been installed.
|

The toilet, shower fixtures, and cabinetry in the
master bathroom of A7 have also been installed.
|

This is the frame where A7's Jacuzzi will soon be installed.
|