A7 Construction Progress - October 2007


Milestone

Windows
& Doors

Paint

Tile

Finish Work

Appliances
& Fixtures

Furniture

Complete

Completion Date

X

X

X

Nov 07

Nov 07

Nov 07

Nov 07

% Complete

70%

75%

80%

85%

90%

95%

100%


The Phoenix Resort in Belize Condo A7 #1


Here is a view of second floor
condo A7's spacious private veranda.



The Phoenix Resort in Belize Condo A7 #2


The woodworks inside A7 are presently being installed.





The Phoenix Resort in Belize Condo A7 #3




Here is the GE slide in range that recently arrived onsite.





The Phoenix Resort in Belize Condo A7 #4



This is the GE stainless steel refrigerator
that will soon be installed in A7's kitchen.






The Phoenix Resort in Belize Condo A7 #5




This is A7's large capacity GE stackable laundry center
.





The Phoenix Resort in Belize Condo A7 #6



The toilet, shower fixtures, and cabinetry
in the guest bathroom of A7 have all been installed.








The Phoenix Resort in Belize Condo A7 #7



The toilet, shower fixtures, and cabinetry in the
master bathroom of A7 have also been installed.






The Phoenix Resort in Belize Condo A7 #8



This is the frame where A7's Jacuzzi will soon be installed.



A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12


B1

B2

B3

B4

B5

B6

C1

C2

C3

C4

C5

C6


The Phoenix Pools & Property






Construction Progress Chart

Construction History Chart

Construction Photo Gallery

Main Photo Gallery