A5
Construction Progress - May 2008
| Milestone |
Paint & Tile |
Kitchen
&
BTH Cabinets |
Appliances
& Fixtures |
Wood
Finish Work |
Furniture |
Complete |
|
Completion Date |
X |
X |
X |
X |
May
2008 |
May
2008 |
| %
Complete |
75% |
80% |
85% |
90% |
95% |
100% |
|

Here
is the kitchen of condo A5.
Many smaller appliances and
various kitchen accessories are in the process of being set up.
|

Condo A3 features the same beautiful psalm
wood interior doors found in each Phoenix condo.
|

All
of the condos in Building A feature
spacious closets in the guest and master bedroom.
|

All
of the interior teak molding and
curtain rods have been installed in condo A5.
|

The
master bathroom of condo A5 is now complete.
|

Above
is the spacious Jacuzzi tub alongside the large
open shower in the master bathroom of condo A5.
|

Condo
A5's guest bedroom is finished with the same marble
countertops and Kohler fixtures as found in the master bathroom.
|

Condo
A5 features the largest private veranda at The Phoenix.
|

Here
is a perspective of the main
pool of The Phoenix from condo A5.
|

Here
is a view looking over the main
pool towards residential Buildings C & D.
|