A4
Construction Progress - December 2007
| Milestone |
Windows
& Doors |
Paint |
Tile |
Finish
Work |
Appliances
& Fixtures |
Furniture |
Complete |
|
Completion Date |
X |
X |
X |
Mar
08 |
Mar
08 |
Mar
08 |
May
08 |
| %
Complete |
70% |
75% |
80% |
85% |
90% |
95% |
100% |
|

A4 is the first floor condo seen here. The living room, guest
bedroom, and master bedroom all open to the spacious veranda.
|

A4's
veranda extends nearly 12' towards the pools and grounds.
|

Here
is the living room and kitchen of condo A4 in December 2007.
A4's west wall offers two 4' by 4' windows, one of which is seen
here.
|

Here
is the walk-in closet of A4's master bedroom.
|

Here
is treated pine frame where
the Jacuzzi tub will be installed.
|

Large
benches were built into the back
wall of each shower to make bathing easier.
|

Large
benches were built into the back
wall of each shower to make bathing easier.
|

Here
is the Caribbean view from A4's veranda
overlooking construction of the main pool of The Phoenix.
|