Construction Progress - December 2007
| Milestone |
Windows
& Doors |
Paint |
Tile |
Finish
Work |
Appliances
& Fixtures |
Furniture |
Complete |
|
Completion Date |
X |
X |
X |
X |
X |
Jan
08 |
Jan
08 |
| %
Complete |
70% |
75% |
80% |
85% |
90% |
95% |
100% |
|

A3 is the first floor condo seen here. The living room, guest
bedroom, and master bedroom all open to the spacious veranda.
|

A3's
veranda extends nearly 12' towards the pools and grounds.
|

Here
is the living room and
kitchen of condo A3 in December 2007.
|

The
Belizean hardwood cabinets and
granite countertops were installed this month.
|

Next
the GE stainless steel appliances will be installed.
|

The
kitchen island has a separate
breakfast bar installed at table height.
|

Recessed
lighting was installed
along the top row of kitchen cabinets.
|

All
of the wood finish work in A3 has been
completed, including the 8' tall hallway doors pictured here.
|

The
guest bathroom's marble countertop was recently
installed. The sink was offset to create an area to fold laundry.
|

The
master bathroom's marble countertop and
Kohler fixtures were also recently installed.
|

The
marble trim around the
Jacuzzi tub was also recently completed.
|

Here
is the closet of A3's guest bedroom.
|

All
of the bath and kitchen
fixtures have been installed in condo A3.
|

Here
is the Caribbean view from A3's
veranda overlooking ongoing pool construction.
|