Construction Progress - March 2007
| Milestone |
Foundation |
Walls |
Roof |
Windows
& Doors |
Paint
& Tile |
Finish
Work |
Complete |
|
Completion Date |
X |
X |
X |
X |
X |
|
|
| %
Complete |
20% |
40% |
60% |
70% |
80% |
90% |
100% |
|

The three sets of windows and doors on the first
floor provide access to the three rooms of condo A2.
|

The exterior finish plaster of A2 was recently completed.
|

With
the walls painted and floors tiled we are
stock piling woodworks soon to be installed in A2.
|

A2
offers a spacious living room measuring the same
interior dimensions as found in each of our 30 condos.
|

The
large master bedroom currently contains plycem
soon to be installed on the second floor of Building A.
|

The Caribbean view from A2's master bedroom.
|

A2 offers a long central hallway stretching the length of the
condo.
|

The veranda extends over 11' towards the
Caribbean and spans the length of the condo.
|

This
is the framed view provided by the
privacy wall that separates A1 and A2.
|

The
Caribbean view from A2 is beautiful and expansive.
|