A2
Construction Progress - February 2008
| Milestone |
Paint & Tile |
Kitchen
&
BTH Cabinets |
Appliances
& Fixtures |
Wood
Finish Work |
Furniture |
Complete |
|
Completion Date |
X |
X |
X |
X |
Mar
08 |
Mar
08 |
| %
Complete |
75% |
80% |
85% |
90% |
95% |
100% |
|

Here
is the living room and kitchen
of condo A2 in mid February 2008.
|

Each
Phoenix condo offers Belizean hardwood cabinetry, Kohler
fixtures, granite countertops, and GE stainless steel appliances.
|

Each
master bedroom in Building A offers a spacious walk-in closet
(at center) and private access to the master bathroom (at left).
|

This
is the view of the main pool of The Phoenix
and the Caribbean beyond from A2's guest bedroom.
|

This
is the view from the master bedroom of condo
A2 looking out towards the main pool of The Phoenix.
|

Here
is the marble countertop and psalm wood
cabinetry found in the guest bathroom of condo A2.
|

Each
master bathroom features two Kohler sinks, Kohler fixtures,
marble countertops, psalm cabinetry, and other fine finishing
details.
|

The
Jacuzzi tub in A2 has been set and
the Kohler fixtures will soon be installed.
|

Each
Building A condo features a spacious
private veranda facing the pool and grounds.
|

Each
Phoenix condo in Building A
also offers beautiful Caribbean views.
|

This
is another perspective of the grounds
and Caribbean beyond from condo A2.
|

The
walls that separate the condos in Building A feature 4' by 4'
openings that provide framed views and alley ways for the breeze.
|