This
is the beautiful Caribbean view from condo A12. A12 is one of
the two remaining third floor two bedroom condos at The Phoenix.
|

Wooden
pergolas will soon be
installed over A12's private veranda.
|

Inside
A12 our crew will soon install lighting fixtures
and fans, to be followed by woodworks in January 2008.
|
|

A12's
verandas offers both Caribbean and sunrise views
to the east and lagoon and sunset views to the west.
|

A12
is the third floor condo pictured here. It's location looks out
over the portion of the property where our
lap pool will be built.
|