A12
Construction Progress - May 2008
| Milestone |
Paint & Tile |
Kitchen
&
BTH Cabinets |
Appliances
& Fixtures |
Wood
Finish Work |
Furniture |
Complete |
|
Completion Date |
X |
X |
May
2008 |
June
2008 |
June
2008 |
June
2008 |
| %
Complete |
75% |
80% |
85% |
90% |
95% |
100% |
|

The
kitchen of condo A12 will be completed later this month.
|

Condo A12 features two 4' by 4' windows along its western wall
that
bring a great deal of natural light into the living room and kitchen.
|

All
of the teak molding around the windows and doors
and the curtain rods have been installed in condo A12.
|

Here
are the large windows and doors of A12's guest bedroom.
|

The
marble countertops around the Jacuzzi tub
in the master bathroom will be installed next.
|

The
cabinets in the master bathroom have been
installed along with the floating shelf and mirror.
|

Condo
A12 offers a 400 square foot private veranda.
|

Here
is a view of the main pool of The Phoenix
and the Caribbean beyond from condo A12.
|

Condo
A12 is the third floor condo seen at right.
|

Condo
A12 is the lone remaining third floor condo at The Phoenix.
|