A11 Construction Progress - September 2007


Milestone

Windows
& Doors

Paint

Tile

Finish Work

Appliances
& Fixtures

Furniture

Complete

Completion Date

X

X

X

Jan 08

Feb 08

Mar 08

Apr 08

% Complete

70%

75%

80%

85%

90%

95%

100%

The Phoenix Resort in Belize Condo A11 #1


This is the amazing Caribbean view from condo A11. A11 is one of
the two remaining third floor two bedroom condos at The Phoenix.



The Phoenix Resort in Belize Condo A11 #2


Wooden pergolas will soon be
installed over A11's spacious veranda.






The Phoenix Resort in Belize Condo A11 #3



Inside A11 our crew will soon install lighting fixtures
and fans, to be followed by woodworks in January 2008.





The Phoenix Resort in Belize Condo A11 #4



The veranda of A11 will feature stainless steel cable
handrails matching the system recently installed on Building D.







The Phoenix Resort in Belize Condo A11 #5



This is the elgantly designed back
hallway that leads to condo A11.







The Phoenix Resort in Belize Condo A11 #6



With all of Building A's exterior now painted and tiled, our crew
can focus on finishing the interiors of the building's 12 condos.




A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12


B1

B2

B3

B4

B5

B6

C1

C2

C3

C4

C5

C6


The Phoenix Property 1




Construction Progress Chart

Construction History Chart

Construction Photo Gallery

Main Photo Gallery